Your estimate
Concrete needed (with allowance)
About 0.66 m³
- Concrete before allowance
- 0.6 m³
- Allowance added (10%)
- 0.06 m³
Based on
- 3 m × 2 m × 0.1 m deep
- A flat, level, rectangular pour of even thickness
- 10% allowance for waste
- No bag count: add your product’s yield under “More options” to see one
Estimate only. Actual amounts vary with the product, ground conditions and how it’s laid.
How the calculation works
For a slab or base, the calculator multiplies the length, width and depth to get the volume in cubic metres (m³).
For post holes, it works out the volume of one round hole (a cylinder) and multiplies it by the number of holes.
It then adds your waste allowance on top. Concrete is usually ordered by the cubic metre from ready-mix suppliers, or bought in bags for small jobs.
Slab volume = length × width × depth
Post hole volume = π × (diameter ÷ 2)² × depth × number of holes
Concrete to order = volume × (1 + allowance ÷ 100)Assumptions
- The area is a flat rectangle with an even thickness. For L-shapes and odd shapes, split them into rectangles and add the results.
- The waste allowance (10% by default) is a rule of thumb, not a standard. Increase it for uneven ground or if you are digging by hand.
- Post holes are treated as straight-sided cylinders. The volume taken up by the post is not subtracted, so you will have a little to spare.
- We do not assume a bag size. Different pre-mixed products make different amounts of concrete per bag. A bag count is only shown if you enter the yield from your product.
- The calculator does not tell you how thick a slab should be or what strength of concrete to use. That depends on the job and the ground, so ask your supplier or a builder.
Example: a 3 m × 2 m shed base, 100 mm thick
- Convert 100 mm to metres: 0.1 m.
- Volume = 3 × 2 × 0.1 = 0.6 m³.
- Add 10% for waste: 0.6 × 1.10 = 0.66 m³.
- So you would order about 0.66 m³ of concrete.
Useful tips
- Measure the depth in several places. Ground is rarely perfectly level and a small difference in depth makes a big difference in volume.
- Ready-mix suppliers often have a minimum order or charge for part loads, so ask when you ring for a quote.
- For anything bigger than a small pad, compare the cost of bags against a ready-mix delivery. Mixing a lot of bags by hand is heavy work.
- Have the formwork, tools and help ready before the concrete arrives. Ready-mix starts to set once it is mixed.
Frequently asked questions
How do I convert my measurements to metres?
You don’t need to. Pick mm, cm or m beside each measurement and the calculator converts it. For reference, 100 mm = 10 cm = 0.1 m.
How many bags of concrete do I need?
It depends on the product, because bags of different sizes and mixes make different amounts of concrete. Find the yield on the bag or data sheet (in m³ per bag) and enter it under “More options”. The calculator will round the bag count up for you.
Why add a waste allowance?
Ground is rarely perfectly flat, excavations are often a little deeper than planned, and some concrete is always lost in the mixer, barrow and formwork. Running short halfway through a pour causes far more trouble than having a little left over.
How thick should my slab be?
That depends on what it will carry and on your ground conditions, so this calculator doesn’t recommend a thickness. Ask your builders’ providers, the shed or garage manufacturer, or a builder.