Kerbing Calculator

Work out how many kerbs you need to edge a driveway, path or patio, and roughly how much concrete the bed underneath will take. Use the length of the kerb product you plan to buy.

Want a full plan for the job? Try the Kerbing Planner. It asks a few questions and builds your shopping list, steps and supplier questions.

Measure along the line the kerbs will follow. Add up all the sides.

Check the product. Many precast kerbs are 915 mm long, and block kerbs are much shorter (often 200 mm).

Covers cutting at curves, corners and ends, plus the odd broken unit. 5% is a rule of thumb. Use more for lots of curves.

Example value only. The bed and haunch size should come from your installer or the kerb manufacturer.

Include the haunch (the concrete packed up the back of the kerb) in this depth for a simple estimate.

Your estimate

Kerbs to buy

23 kerbs

Kerbs before allowance
21.9 kerbs
Concrete for the bed (with allowance)
About 0.945 m³Before allowance: 0.9 m³

Based on

  • 20 m of kerbing
  • Kerbs 0.92 m long
  • 5% extra for cuts and breakages
  • Concrete bed 0.3 m wide × 0.15 m deep, treated as a simple rectangle

Estimate only. Actual amounts vary with the product, ground conditions and how it’s laid.

How the calculation works

The number of kerbs is the total run divided by the length of one kerb, plus an allowance for cuts and breakages, rounded up.

The concrete bed is treated as a rectangular strip running the full length of the kerbing: length × bed width × bed depth, plus the same allowance.

Kerbs = ⌈(run length ÷ kerb length) × (1 + allowance ÷ 100)⌉
Bed concrete = run length × bed width × bed depth × (1 + allowance ÷ 100)

Assumptions

  • Kerbs are laid end to end with no significant gap. If your joints are wide, the count will be slightly high, which is the safe direction.
  • The 915 mm kerb length is a common precast size but not universal. Check your product.
  • The concrete bed is simplified to a rectangle. In practice, kerbs usually sit on a bed with a sloped haunch behind. The 300 mm × 150 mm defaults are example values only. Get the real size from your installer or the manufacturer.
  • This doesn’t cover excavation, sub-base or the kerb’s own volume.

Example: 20 m of kerbing using 915 mm kerbs

  1. 20 ÷ 0.915 = 21.9 kerbs.
  2. Add 5%: 21.9 × 1.05 = 22.95, rounded up = 23 kerbs.
  3. Bed concrete at 300 mm × 150 mm: 20 × 0.3 × 0.15 = 0.9 m³.
  4. Add 5%: about 0.95 m³ of concrete.

Useful tips

  • Curves use more cut kerbs, or special radius kerbs, so increase the allowance for curved driveways.
  • Set out the line with string and pins first. Measuring the string gives a much better total than guessing.
  • For the concrete, you can use the Concrete Calculator to compare bags against ready-mix.

Frequently asked questions

How many kerbs do I need for 20 metres?

With 915 mm kerbs, about 22 before allowance, or 23 with 5% extra for cuts and breakages. With shorter block kerbs you need many more. Enter your kerb length to check.

How much concrete goes under a kerb?

That depends on the bed and haunch your installer specifies. Enter their width and depth and the calculator works out the volume for your full length.

Do I need kerbs for a gravel driveway?

Edging is commonly used to hold gravel in place and keep a neat line, but it depends on the design. Ask your installer.

Was this calculator helpful?